- Topic ID: id_17423070
- Version: 3.0
- Date: Apr 22, 2019 12:56:39 AM
Equipped FAN Inverter Replacement
Prerequisites
Overview
-
Remove old Fan Inverter
-
Replace new Fan Inverter
1 Equipped Fan Inverter Removal
Procedure
danger- Move table to its lowest elevation.
- Remove power to the gantry using proper Lockout/Tagout procedures.
- Remove side top and front gantry covers.
- Stop the rotor of X-ray tube in case of Liquid Bearing Tube before HVDC off. Refer to Liquid Bearing Tube Rotor stop procedure for details.
- Turn OFF all 3 switches (Axial Drive, HVDC, 120VAC) on the Service Switch Panel.
- Remove power at main disconnect (A1) panel. Use proper Lockout/Tagout procedures.
- Cut any ty-wraps holding the cables to the Fan Inverter.
- Disconnect the power cable connector of the Fan Inverter.
- Unscrew the 2 screws, and remove the Fan Inverter from the Power
Unit.
Figure 1. Equipped Fan Inverter Removal

2 Equipped Fan Inverter Installation
Procedure
- Place the new Fan Inverter on the Power Unit.
- Connect the power cable connector of the Fan Inverter.
- Fasten the cables to the Fan Inverter using tie-wraps.
3 Finalization
Procedure
- Verify that the Fan is operating normally.