- Topic ID: id_17423489
- Version: 3.0
- Date: Dec 3, 2019 2:00:58 AM
Hart Board Assembly Replacement
Prerequisites
Procedure
- notice
- Move the cradle to the OUT mechanical limit position by hand.
- Raise the Table to its highest position.
- Remove power from Table by turning off “120VAC”, “Axial Drive” and “HVDC” switches on the service switch panel.
- Remove the following cover from the Table:
-
Rear Bottom Cover (refer to Table Covers Removal)
-
- Remove 4 screws, and slide the power driver support toward the
Gantry.
Figure 1. Location of the Hart Board Assembly

- Remove the board cover by unscrewing its 2 screws.
Figure 2. Board Cover Removal

- Disconnect the cable connector J1 from the board.
- Remove the Hart Board Assembly by unscrewing its 3 screws.
Figure 3. Hart Board Assembly Replacement

- Install the new Hart Board Assembly by referring toStep 8 through Step 6.
- Restore the Table to original configuration.
![]() |
Finalization
No finalization steps.
