- Topic ID: id_15460486
- Version: 4.0
- Date: Sep 26, 2020 10:11:52 PM
JEDI Noise Test (Pro16, RT)
Prerequisites
Overview
The objective of this procedure is to verify that the DAS is not affected by noise created by the JEDI X-Ray Generator subsystem, in particular the High Voltage cables connecting the inverter to the tank. Procedure summary:
-
Block collimator output so x-rays do not hit detector
-
Take scan
-
Analyze data and compare to specs
Procedure
- Set up test scans.
- Remove gantry right side cover.
- Turn off the axial drive enable switch on the Service Switch Panel.
- Remove the mylar scan window.
- Rotate the gantry so that the tube is at the 6 o'clock position (tube at the bottom with the window facing up).
- Engage rotational lock. Check that the gantry is securely locked by attempting to rotate the gantry by hand.
- Fold a lead apron so that it is an inch or more thick. Cover the window of the tube with this lead apron so that x-rays cannot escape the tube.
- Launch the DIAGNOSTIC DATA COLLECTION tool.
- Select STATIC SCAN - X-RAYS ON. Prescribe a scan
with the parameter values described below. Leave everything to default and
make the following changes:
-
kV - 120
-
mA - 440
-
Gain - 3
-
Filter - BLOCKED
-
Slice Thickness - 16 X 1.25 MM
-
Cal Vectors - NONE
note:Before pressing the scan enable button, verify gain has not changed by itself to some other value.
-
- Perform the scan.
- Select STATIONARY SCAN - X-RAYS OFF. Prescribe
a scan with the parameters described below. Leave everything to default and
make the following changes:
-
Gain - 3
-
Rotor Rx Overrides - ON
-
Slice Thickness - 16 x 1.25mm
-
Cal Vectors - NONE
note:Verify that gain has not changed by itself to some other value.
-
- Perform the scan.
- Analyze the data:
- Open the Common Service Desktop and press the IMAGE QUALITY button.
- RUN SCAN ANALYSIS tool.
- Find the scan you just performed and select Create MSD DD File.
- Create an MSD DD file for each scan. Wait for message indicating file(s) created.
- Select the DD tab, then select Update
- Find the two MSD files you just created
- Select the MSD file for scan 1 (the X-Ray on scan) and press the File 1 button. For the X-Ray off scan, select File 2.
- Under Math Operations make sure the plot button is selected and press the file subtraction button (-). The second scan will be subtracted from the first and a plot of the difference will be displayed.
- Scroll through each of the Vector 2 plots for each set. Compare the values to the specifications table.
- Scroll through each of the standard deviation plots. Record the maximum
values found in each range of channels in the middle two rows of Table 3.
- The test fails if any of the observed maximum values are greater than the spec. A likely cause is the positioning and securing of the high voltage cables between the tank and inverter. See Inverter/Tank AC Wire Routing for more details. This test must pass for the system to be used.
Finalization
No finalization steps.