- Topic ID: id_16158038
- Version: 2.0
- Date: Apr 9, 2020 8:49:05 PM
Fuse Box Switch Assembly Replacement
Prerequisites
Overview
Procedure
- Remove gantry covers as required.
Refer to
danger- Turn off all 3 switches (Axial Drive, HVDC, 120VAC). Remove all system power at the Main Disconnect panel and use proper Lockout/Tagout procedures.
- Rotate Fuse Box Assembly to 10 o’clock.
danger- Lock the gantry in position, using the rotational lock.
- Remove the hex screws that secure Fuse Box Assembly.
- Slide fuse box up so that washers fit through aperture on fuse box, and then release the fuse box.
- Cut any necessary tie-wraps.
- Disconnect all associated terminals and cables.
- Install new Fuse Box Assembly and reconnect terminals/cables.
- Reassemble gantry.
Finalization
No finalization steps.