• Topic ID: id_16157846
  • Version: 2.0
  • Date: Apr 9, 2020 8:49:27 PM

E-Stop Button Replacement

Prerequisites

Overview

Procedure

  1. Remove gantry covers as required.

    Refer to Parts Replacement > Gantry > Enclosure > (Cover Removal Procedure).

  2. Notice Image
    • notice
    • Always turn OFF the HVDC before the 120 VAC. Turning OFF 120 VAC power before HVDC power can result in equipment damage.
  3. Turn off all three (3) switches (Axial Drive, HVDC, 120VAC) on the Service Switch Panel.
  4. Loosen two (2) screws to remove the two (2) cables.
  5. Loosen the four (4) hex screws that fasten the emergency stop button to the cover.
  6. Replace the emergency stop button and reconnect cables.
  7. Notice Image
    • notice
    • Always turn ON the 120 VAC before the HVDC. Turning ON HVDC power before 120 VAC power can result in equipment damage.
  8. Reassemble gantry.

Finalization

  1. Confirm that all E-stop buttons are operational.