• Topic ID: id_16157812
  • Version: 2.0
  • Date: Apr 9, 2020 8:42:51 PM

Collimator Control Board Check

Prerequisites

Overview

Procedure

  1. Verify correct “Flash” firmware is downloaded.
  2. Launch the COLLIMATOR FUNCTIONAL TEST.
  3. Exercise the Application Position Test and verify no test failures. See Figure 1.

    Figure 1. Collimator Applications Position Test

Finalization

No finalization steps.