- Topic ID: id_18480595
- Version: 3.0
- Date: Jan 20, 2020 8:35:44 PM
HP Host Computer Z800 USB Extender
Prerequisites
Overview
Procedure
- Select one of the following methods to Power OFF the Operator
Console:
- If Applications are up, click on the Shut Down button and select Shutdown.
The Operator Console monitor will display a 'Power Down' message when it is acceptable to power OFF the Operator Console.
- If Applications are down, open a Unix Shell. Type: halt.
- If Applications are up, click on the Shut Down button and select Shutdown.
- Power OFF the console at the front panel switch.
- Remove the left side cover.
Refer to
- Remove the following components from the host computer (Z800):
-
Side Access Panel
-
Expansion Card Support
-
FDIP Card
-
FX1800 Graphic Card
-
NIC Card
-
RAID Controller
-
FX4800 Graphic Card
-
- Replace the existing USB extender with new one.
- Reinstall all removed components, and reconnect any cables that have been disconnected.
Finalization
- Refer to System Scanning Test to confirm proper operation.
- Reinstall the console covers.