• Topic ID: id_11038868
  • Version: 2.0
  • Date: Jan 30, 2019 9:43:03 PM

New Tube Configure

Prerequisites

Procedure

  1. Run NEW TUBE CONFIG program.
  2. Enter the failure codes and new values.
  3. Exit.
    • The console will reboot after performing this operation.

    • The system will set the tube temperature to hot, after configuring a new tube. The cooling delay is approximately 90 minutes.

Finalization

No finalization steps.