- Topic ID: id_16157812
- Version: 2.0
- Date: Apr 9, 2020 8:42:51 PM
Collimator Control Board Check
Prerequisites
Overview
Procedure
- Verify correct “Flash” firmware is downloaded.
- Launch the COLLIMATOR FUNCTIONAL TEST.
- Exercise the Application Position Test and verify no test failures.
See Figure 1.
Figure 1. Collimator Applications Position Test

Finalization
No finalization steps.