Upper Bulkhead Panel Connector Replacement
Prerequisites
Overview
This procedure describes and illustrates the steps necessary to replace connectors located on the Upper Bulkhead Panel of the Operator Console. Since the Upper Bulkhead Panel utilizes connectors with disconnects on both the front and rear of the Upper Bulkhead Panel, only the connectors will be supplied as FRUs. The sheet metal panel should last the life of the equipment.
Figure 1. Upper Bulkhead Panel

1 Power-Off (Shut Down) the Console
Procedure
- Select one of the following methods to power off the Operator
Console:
-
If applications are running, click the Shut Down icon and select Shut Down.
-
If applications are down, open a Unix Shell using the Toolchest, type: {ctuser@hostname} halt. Enter.
The Operator Console monitor will display a System Halted message when it is acceptable to power off the Operator Console.
-
- Power OFF the Operator Console at the front panel switch. (See Figure 2.)
Figure 2. Console Power Switch

2 Removing Defective USB Connector on Upper Bulkhead Panel
Procedure
- Remove Console Rear Cover and set aside.
- Disconnect cables connected to the defective USB Connector on
the Upper Bulkhead Panel.note:
Take care to check that the cables are properly labeled for their respective connections.
- Uninstall USB Connector from the Upper Bulkhead Panel by removing
the two (2) 3mm socket cap mounting screws holding the connector to
the panel.
Figure 3. Upper Bulkhead Panel Mounting

- Remove the USB Connector from the Upper Bulkhead Panel.
3 Install New USB Connector in Upper Bulkhead Panel
Procedure
- Install the USB Connector on the Upper Bulkhead Panel using the two (2) 3mm socket cap mounting screws removed earlier. Torque to 0.5 N-m.
- Reconnect the USB Cables to the Upper Bulkhead Panel.
Figure 4. Upper Bulkhead Panel Connections
note:The GOC6 Operator Console may utilize PS/2 or USB Keyboards and Mouse. If console is equipped with USB Keyboard and/or Mouse, connect these devices as shown above. PS/2 Keyboards and/or Mouse connect directly to the respective PS/2 Ports on the Host Computer.
4 Verify Replacement Connector
Procedure
- Apply power to the console using the operator console power switch.
- Test the replacement Upper Bulkhead Panel connector by verifying
that communications and signal paths have been restored. Verify that
the system boots properly and that Keyboard, Mouse, Trackball and
Bar Code Reader (if so equipped) function properly.note:
No other verification is necessary.
5 Finalization
Replace Console Rear Cover.