Mechanical-Electrical Transition Checklist

1 Mechanical Installation Completion Checklist

System-Level

  • FE Service cabinet moved to the location shown on the site print

  • All covers installed and aligned

  • All options installed on the table and gantry

  • All packing materials and boxes returned to the lean cart

  • All service items placed in the service cabinet.

Optional and Regional

  • Seismic mounting installed, if required in your area.

Site Clean Up

  • All customer items placed on a cabinet or on a counter and labeled customer material.

  • All system service tools placed in the GE service cabinet.

  • System software and options left on the lean cart in the software tray

  • System cleaned and nicks repaired

  • Installation site cleaned and all trash properly disposed.

Dolly Return

  • Return of dollies and lean carts arranged for and pick-up made.

Paperwork

  • Mechanical installation section of the GE Form e4879 completed

    • Room information recorded on the GE Form e4879

    • Table gantry alignment completed per the installation manual

    • Table gantry anchoring completed per the installation manual

  • GE Healthcare personnel notified that the mechanical installation is completed

  • All installation issues have been addressed and or documented so FE can follow-up as needed.

note:

This is the END of the Mechanical Installation.

2 Electrical Introduction

2.1 Installer/FE Notices

2.2 Introduction

Use the continuity and ground checks to verify that the system power connections have not shorted to ground and that the ground and neutral connections are intact.

2.3 Review Mechanical Hand Off Material

Complete the Mechanical Hand Off checklist:

  • All options were installed. If not, contact your Project Manager of Installation.

  • Check for short ships.

  • Complete paperwork and phone calls as needed.

  • Review cable connections with mechanical team.

2.4 Calibration Training Requirements

See requirements outlined in Book 1.

2.5 Required FE Common Tools and Supplies

2.5.1 Safety Materials

note:

Items with “checks” (√) are included in the Install Support Kit

√ Lockout/Tagout kit, or equivalent

Safety Glasses

2.5.2 Cleanliness

The system must not be located in, near, or around construction. The room should be clean and clear of construction dust and installation materials.

Notice Image
  • notice
  • NEVER USE AN ERASER TO CLEAN ANY PART OF THE DAS.

2.6 Requirements/Assumptions

  • The procedures in this manual are performed by an appropriately trained GE engineer.

  • You need the Internet (IP) addresses the first time you execute a reconfig on the system.

    • When you connect the system to a network, contact the system administrator to obtain the IP addresses for all the computers in the suite.

2.7 FE Workflow

  1. Review mechanical hand-off material. Check that the Mechanical section of GE Form e4879 is completed.

  2. Obtain required FE common tools and supplies.

  3. Perform electrical power-on and ground checks.

  4. Gather all customer information needed for reconfiguration.

  5. Perform computer integration.

  6. Complete Table/Gantry integration.

  7. Complete the calibration process.

  8. Perform tube warm-up and fast calibration.

  9. Complete tomographic plane indication.

  10. Check table/gantry alignment.

  11. Run image series tests.

  12. Run system functional test.

  13. Verify that all options were installed.

  14. Create system state DVD.

  15. Complete network connections.

  16. Perform Patient Touch Leakage test.

  17. Perform the CT System Chassis Leakage test, as required by local code.

  18. Complete installation and verification of any customer options.

  19. Complete and return GE Form e-4879 Installation Data Verification for all installations.