Final Installation Checklist

1 System-Level Tasks

Complete the tasks listed and check the appropriate box on the GE e-4879 form.

1.1 General

  • HVAC system is operational and environmental data reported on the GE e-4879 form.

  • System realignments completed, if required.

  • Broadband installed and operational.

  • Power and ground audit completed.

1.2 Optional and Regional

  • Seismic mounting kit installed, if required in your area.

  • Generator recalibration completed, if necessary.

  • Collimator recalibration completed, if necessary.

2 Site Clean-Up

  • All DVDs for customer options placed in the GE service cabinet.

  • All system software and service tools placed in the GE service cabinet.

  • System cleaned and nicks touched up with paint.

  • Room is cleaned and all trash disposed of properly.

  • Installation site cleaned and all trash properly disposed.

3 Dolly Return

Return of dollies arranged and dolly pick-up made.

4 Options

Check the appropriate box on the GE e-4879 form to verify the installation and proper functionality of all customer-ordered options.

  • Injector installed and operational.

  • Advantage Windows Workstation installed and functional tests completed.

  • Advantage 4D installed and functional tests completed.

  • Filming/Camera/DASM installed and operational.

  • Modem installed and functional tests completed.

  • UPS installed and functional tests completed.

  • Network items installed and functional tests completed.

  • Customer software options installed and operational.

  • Teleradiology connections completed.

  • Remote monitor installed and operational.

  • Bar Code Reader installed and operational.

  • Cardiac monitor and stand installed and operational.

5 Final Activities (Paperwork)

  • GE e-4879 completed; see GE and Regulatory Forms. (Required for installations in ALL countries.)

  • FDA 2579 completed; see GE and Regulatory Forms. (Required ONLY for U.S. installations.)

  • Any PQRs or PSRs encountered have been reported.

  • All FMIs for system completed, if necessary.

  • All dispatching activities (03-04-10 codes) completed.

  • Customer acceptance checks completed.

  • System transfer completed and appropriate GE Healthcare personnel notified.

  • All outstanding customer installation issues have been addressed.