Final Installation Checklist
1 System-Level Tasks
Complete the tasks listed and check the appropriate box on the GE e-4879 form.
1.1 General
-
HVAC system is operational and environmental data reported on the GE e-4879 form.
-
System realignments completed, if required.
-
Broadband installed and operational.
-
Power and ground audit completed.
1.2 Optional and Regional
-
Seismic mounting kit installed, if required in your area.
-
Generator recalibration completed, if necessary.
-
Collimator recalibration completed, if necessary.
2 Site Clean-Up
-
All DVDs for customer options placed in the GE service cabinet.
-
All system software and service tools placed in the GE service cabinet.
-
System cleaned and nicks touched up with paint.
-
Room is cleaned and all trash disposed of properly.
-
Installation site cleaned and all trash properly disposed.
3 Dolly Return
Return of dollies arranged and dolly pick-up made.
4 Options
Check the appropriate box on the GE e-4879 form to verify the installation and proper functionality of all customer-ordered options.
-
Injector installed and operational.
-
Advantage Windows Workstation installed and functional tests completed.
-
Advantage 4D installed and functional tests completed.
-
Filming/Camera/DASM installed and operational.
-
Modem installed and functional tests completed.
-
UPS installed and functional tests completed.
-
Network items installed and functional tests completed.
-
Customer software options installed and operational.
-
Teleradiology connections completed.
-
Remote monitor installed and operational.
-
Bar Code Reader installed and operational.
-
Cardiac monitor and stand installed and operational.
5 Final Activities (Paperwork)
-
GE e-4879 completed; see GE and Regulatory Forms. (Required for installations in ALL countries.)
-
FDA 2579 completed; see GE and Regulatory Forms. (Required ONLY for U.S. installations.)
-
Any PQRs or PSRs encountered have been reported.
-
All FMIs for system completed, if necessary.
-
All dispatching activities (03-04-10 codes) completed.
-
Customer acceptance checks completed.
-
System transfer completed and appropriate GE Healthcare personnel notified.
-
All outstanding customer installation issues have been addressed.