- Topic ID: id_11039104
- Version: 3.0
- Date: Apr 9, 2020 8:42:22 PM
Tube Temperature Verification Procedure
Prerequisites
Verify Tube Temperature < 200º C
Procedure
- Click DAILY PREP
- Click TUBE WARM-UP
- Click ACCEPT in pop-up window
- Click PAUSE
- Click CANCEL (Do not QUIT Daily Prep)
- notice
- Open system error log (gesys_suite.log)
- Click LAST PAGE
Look for this type of entry:
This entry is created when Pause is clicked.
bay57 dailyPrepRx
StateMachineEventNotify.c 418
Tube temperature before Cold Tube Warmup is 315.15 degrees Celsius.
This entry is created when Cancel is clicked.
bay57 dailyPrepRx
StateMachineEventNotify.c 411
Tube temperature after Cold Tube Warmup is 312.89 degrees Celsius.
Start Tube Alignments when 200.00 degrees Celsius is reported.
bay57 dailyPrepRx
StateMachineEventNotify.c 418
Tube temperature before Cold Tube Warmup is 200.00 degrees Celsius.
- Repeat steps 3 through 5 as necessary to generate updates in the gesyslog.
- Click QUIT to exit Daily Prep, when tube temperature shows 200.00 Celsius.
![]() |
Finalization
No finalization steps.
