System/Site Continuity and Ground Checks
Prerequisites
1 System Continuity (Mechanical Contractor) Procedure
Reference Figure 1.
Procedure
warning- Verify that less than 1 ohm of resistance exists between the
following connections:
Figure 1. Front View of NGPDU with Covers Removed

warning- Set an ohmmeter to the lowest scale. Check between the following
points for shorts to ground. Verify no continuity exists between the
following points:
- Leave the metal cover off the PDU input power panel until you complete the checks in the next section.
2 Site Ground Continuity Check
Procedure
- Use an ohmmeter to verify the presence of less than 1.0 ohm
of resistance between each of the following points:
- Install remaining covers on:
-
Gantry
-
Table
-
Raceway
-
Console
-
PDU
-
3 Finalization
No finalization steps.