PDAS Interface Board (DIFB) Replacement
Prerequisites
Overview
1 Board Removal
Procedure
- notice
- notice
- Position the table to its lowest position.
- Remove the gantry right side cover.
- notice
- Turn OFF Axial Enable, HVDC, and 120VAC switches on the Service Switch panel.
- Remove the gantry top and front covers.
- Position the DAS at the 12 o'clock position.
- Lock the gantry in position using the rotational lock.
- Disconnect all cables on IFB cover. One is Fiber Optic Cable, the other is fan power cable.
- Loose the 3 screws, remove M6 x 6 hex screws on the IFB cover.
See Figure 1
Figure 1. Screws on Chassis
note: Do not touch any other screws on the IFB cover. - Slide the IFB cover.
- Put on wrist strap and use ESD precautions.
Figure 2. DIFB Board removal

- Slide the IFB out of chassis and place into anti-static bag.
![]() |
![]() |
![]() |
2 Board Installation
Procedure
- notice
- Get new IFB from anti-static bag.
- Align IFB edges to board guides in Chassis.
- Slide the board into the chassis and push board into place.
- Install the IFB cover into place
- Secure all the screws. Torque M6 hex screws to 7.9N-m.
- Reconnect fiber optic cable and fan power cable.
- Disengage the rotational lock.
- Turn on Axial Enable, HVDC, and 120VAC switches.
3 Finalization
Procedure
- Perform Flashdowload.
- Verify proper functionality:
- Run at least 10 passes of Scan Data Path Diagnostic.
- Take 10 I/Q scans of the 48cm phantom.
- Verify fault or reason to replace the board now passes.
- Reassemble gantry covers.