Gas Spring Replacement
Prerequisites
Overview
Procedure Effectivity:
Procedure
- Raise the table to maximum height.
- Remove right Gantry Side Cover.
warning- notice
- Remove power from table by turning off 120VAC, Axial Drive and
HVDC switches on Service Switch Panel.note:
Remember to remove all objects from the cradle.
- Remove the Base Covers, the right Side Panels, and the upper side rail covers.
- The gas springs keep the Actuator under tension, even when you
raise the table to maximum height. To remove the tension from the
actuator:
- Raise the table past its upper height limit by manually turning the hex screw on the motor.
- Raise the table to fully extend the gas springs, so that they wiggle back and forth.
- Remove the E-rings from the top and bottom Gas Spring mounting pins.
- Remove the pins from their mounting blocks.
- Remove both Gas Springs.
warning- When you install the replacement Gas Springs:
- Position the Gas Spring pressure chambers UP, or closest to the front table leg.
- Take care to install the E-ring correctly.
- You may need to adjust the height of the table to match the length of the new gas springs.
- Return power back to the table and replace table and gantry covers.
![]() |
Finalization
-

- notice
- Power up the Table from the Service Switch Panel.
- Using the service switches on the MTCB, move the Table up and down, and the Cradle in and out.
- Use the gantry control keys to move the Table up and down, and the Cradle in and out.
- When the Table functions properly, reinstall the Table Base Covers, the Side Panels and the Gantry Side Cover.