- Topic ID: id_18718300
- Version: 1.1
- Date: Aug 18, 2020 3:27:55 AM
Elevation Motor Replacement
Prerequisites
Overview
Procedure Effectivity:
Procedure
- Raise the table to maximum height.
- Remove right Gantry Side Cover.
warning- notice
- Remove power from table by turning off 120VAC, Axial Drive and HVDC switches on Service Switch Panel.
- Remove the Table Base Covers.
- Remove the Feedback control and the power cables to the Elevation Motor.
- Remove the four screws connecting the Motor to the Actuator.
- Remove the Motor from the Actuator.
- Install the new Motor to the Actuator, and connect the power and feedback cables.
- Screw back in the four screws connecting the Motor to the Actuator.
- Return power back to the table and replace table and gantry covers.
![]() |
Finalization
-

- notice
- Power up the Table from the Service Switch Panel.
- Using the service switches on the MTCB, move the Table up and down, and the Cradle in and out.
- Use the gantry control keys to move the Table up and down, and the Cradle in and out.
- When the Table functions properly, reinstall the Table Base Covers, the Side Panels and the Gantry Side Cover.