- Topic ID: id_16158008
- Version: 2.0
- Date: Apr 9, 2020 8:42:17 PM
Accessing the DAS Assembly
Prerequisites
Overview
Procedure
- Remove gantry right side cover, and turn OFF all three (3) service switches.
- Continue to open the gantry, by removing the following:
-
Mylar scan window
-
Left side cover
-
Top covers
-
Front cover
-
- Rotate gantry so that the DAS assembly is at the 12:00 position.
warning- Lock the gantry in position, using the rotational locking pin.
Refer to the “Rotational Locking Pin” section of Equipment Service - Gantry, located in the Safety tab of this publication.
- Put on wrist strap and use ESD precautions. Jack locations for grounding the wrist strap are near the left and right chassis mounting screws.
Finalization
No finalization steps.